Monday, 29 March 2021

29th March 2021


Departure Port: Allington Marina
Departure Time: 11:37
Departure Port Location: Castle Road, Maidstone UK
Waypoint 1: Tovil Bridge
Waypoint 1 Position: Millers Wharf, Maidstone UK
Waypoint 1 Stop: 12:04
Waypoint 1 Start: 12:04
Destination Port: Allington Marina
Destination Arrival Time: 12:46
Destination Port Location: Castle Road, Maidstone UK

Total Trip Time (h:mm:ss): 1:09:00
Trip Distance (nm): 4.7 nm
Total Waypoint Stop Time (h:mm:ss): 00:00
Fuel Usage (litres): 9.07
Trip Engine Hours (h:mm:ss): 1:09:00
Engine Hours (Decimal): 1.15 h
Fuel Added: 0 L

Sky State: Clear Sky
Precipitation: Dry
Wind Speed (kts): 3 Gentle Breeze 7-10
Wind Direction: W
Temperature (c): 16 ℃
Pressure (mb): 1021 bar
Visibility (metre/Miles): Good >5M
Sea State: River Conditions


Crew Names: Ray & Annette
Cruise Notes: A beautiful day with bright, warm sunshine, what a day to going boating. So we took the opportunity of starting up 'Kevayling' and going for the first cruise of 2021. A short trip upriver to Tovil and then an about turn and headed back. Not a long trip but so good to be back on the water.