Sunday 28 February 2016

28th February 2016

Departure Port: Allington Marina
Departure Time: 10:31
Destination Port: Allington Marina
Destination Arrival Time: 11:00

Sky State: Cloudy
Preciptation: Dry
Wind Direction: E
Sea State: Smooth 0.1-0.5m
Temperature (c): 5
Pressure (mb): 1009
Engine Hours: 0.5
Trip Distance (nm): 0
Total Trip Time (hrs): 0.48
Total Trip Time (mins): 29
Fuel Usage (litres): 3.94
Fuel Added: 0 L

Crew Names: Ray,
Cruise Notes: Engines started and run up to temperature, boat not moved as this was a post winter start. Run for half an hour to reach normal running temperature. Other engine service carried out (see maintenance log).