Saturday 26 September 2015

26th September 2015

Departure Port: Allington Marina
Departure Time: 12:20
Departure Port Location: Castle Dene, Maidstone ME14 2NH, UK
Way Point 1: Maidstone Waypoint 1 Fairmeadow, Maidstone ME14 1JP, UK
Destination Port: Allington Marina
Destination Arrival Time: 13:05
Destination Port Location: Castle Dene, Maidstone ME14 2NH, UK

Sky State: Partly Cloudy
Preciptation: Dry
Wind Direction: NE
Sea State: Smooth 0.1-0.5m
Temperature (c): 13c
Pressure (mb): 1014mb
Engine Hours: 0.75
Trip Distance (nm): 2.91
Total Trip Time (hrs): 0.75
Total Trip Time (mins): 45
Fuel Usage (litres): 5.92
Fuel Added: 0 L

Crew Names: Ray, Annette
Cruise Notes: Lunchtime cruise to Maidstone, stopped for a cup of tea rafted besides our old cruising friends, Martin & Liz, onboard Sherwood.