Departure Port: Allington Marina
Departure Time: 11:48
Departure Port Location: Gibraltar Ln, Maidstone
Waypoint 1: Allington Lock
Waypoint 1 Position: The Boathouse, Allington Lock, Castle Road, Maidstone
Waypoint 1 Stop: 12:02
Waypoint 1 Start: 12:16
Destination Port: Chatham Marina
Destination Arrival Time:
14:11
Destination Port Location: 187 Leviathan Way, Chatham
High Water At Destination: 13:04
Total Trip Time (h:mm:ss): 2:23:00
Trip Distance (nm): 12.7
Total Waypoint Stop Time: 14:00
Fuel Usage (litres): 16.96
Trip Engine Hours (h:mm:ss): 2:09:00
Engine Hours (Decimal): 2.15 h
Fuel Added: 0 L
Sky State: Heavy Clouds
Precipitation: Dry
Wind Speed (kts): 4 Moderate Breeze 11-16
Wind Direction: SW
Temperature (c): 19 ℃
Pressure (mb): 1013 bar
Visibility (metre/Miles): Good >5M
Sea State: Smooth 0.1-0.5m
Crew Names: Ray +
Andy & Anita
Cruise Notes: Return Kevayling to her home berth at Chatham Marina
after four days upriver. Loads of debris in the river following a recent storm
which made the first few miles somewhat difficult. Hard run against the tide in
windy conditions but a safe entry in Chatham Marina none the less. Greeted in
the lock by Annette.
Meter Reading: 540 Units
Waiting To Pass Through Allington Lock. |
No comments:
Post a Comment