Friday 3 April 2015

3rd April 2015

Departure Port: Allington Marina
Departure Time: 12:31
Departure Port Location: Castle Dene, Maidstone ME14 2NH, UK
Way Point 1: Elmhaven Marina
Way Point 1 Position: Wouldham, UK
Destination Port: Allington Marina
Destination Arrival Time: 15:40

Sky State: Partly Cloudy
Precipitation: Dry
Wind Direction: N
Sea State: Smooth 0.1-0.5m
Temperature (c): 12c
Pressure (mb): 1001mb
Engine Hours: 4
Trip Distance (nm): 13.5
Total Trip Time (hrs): 3.15
Total Trip Time (mins): 189
Fuel Usage (litres): 31.56
Fuel Added: 0 L

Crew Names: Ray, Annette, Tony Faulkner
Cruise Notes: Shakedown cruise to test out the engines and systems after winter lay-up. Ran down to Elmhaven Marina on the tidal section against the tide both ways.

No comments:

Post a Comment