Friday 4 May 2018

4th May 2018

View Track: http://tinyurl.com/ycjlyc37

Departure Port: Chatham Marina
Departure Time: 13:55
Departure Port Location: 187 Leviathan Way, Chatham ME4 4LP, UK
Way Point 1: Long Reach 14:48
Destination Port: Rochester
Destination Arrival Time: 15:55
Destination Port Location: 10 Esplanade, Rochester ME1 1QN, UK
High Water At Destination: 16:15

Sky State: Partly Cloudy
Preciptation: Dry
Wind Speed (kts): 1 Light Air 1-3
Wind Direction: SW
Visibility (metre/Miles): Good >5M
Sea State: Smooth 0.1-0.5m
Temperature (c): 19
Pressure (mb): 1023
Engine Hours: 2.1
Trip Distance (nm): 12.4
Total Trip Time (hrs): 2
Total Trip Time (mins): 120
Fuel Usage (litres): 16.57
Fuel Added: 0 L

Crew Names: Ray & Annette +
Cruise Notes: Departed for planned weekend at RCC where we will be moored for 2 days in order to visit the annual Sweep Festival in Rochester. Before heading up river to RCC we took advantage of the beautiful weather and headed out into the estuary first. Motored to Long Reach where we turned and made for Rochester, giving the engines a good workout to rid the hull of any weed collected while in the marina. Arrived at RCC and took a temporary berth until instructed by the mooring master.

No comments:

Post a Comment